Hydro Quebec, Kipawa River, Les Amis and Things in General

The plan has been to divert the Kipawa through an entirely new channel/outflow to capture the entire potential between the height of Lake Kipawa and Lake Temiskaming.

I'm not sure about the 132 MW figure. Some have said that it would require the diversion of water from the Dumoine river as well.

As for the EA, it is proponent driven, and I don't know of any cases recently where the EA has stopped development of projects like this.

I do remember seeing a paper abstract that was to be presented at the International Impact Assessment Association by two Hydro Quebec engineers of which Rougon was one. They said that calculating the "reserve flow" was the main issue associated with the Tabaret project. Reserve Flow concerns the minimum amount of water they could leave in the Kipawa and I think that was around 11 cfs and in any case the Laniel Dam was designed specifically to release that amount of water.

The process will involve an EA but my prediction is that the EA will suggest no significant environmental effect... I predict that the province will assign water rights to Quebec Hydro, that they will grant all the necessary permits. I also predict that, most people will never hear about this or have very little input into it, but we may see some protests from the Algonquins. The media may cover it cursorily. Naturally the MRC in Temiskaming will be fully supportive as they have been waiting for their $400,000 a year payments as promised since 1998.

Laniel have their new renovated dam, I assume they will be happy about this project as well as they will see any residual/spin off construction dollars as "good" for Laniel.

It may be useful to have Les Amis submit letters to Hydro Quebec, the Quebec Minsitry of Natural Resources to be put on the mailing list for any announcements or notices concerning public meetings and mailings - they'll do that but everything will be in French.

I think we need other ideas about how to proceed strategically on this file. Fondation Rivieres (FR), the Montreal based river preservation group has been notably mute about the Kipawa. when they did their magazine spread on River Preservation with Roy Dupuis they didn't mention the Kipawa at all. But they may be able to assist us now that Tabaret is back on the Strategic Plan.

I know that the Montreal Paddling Club is our major supporter on this file. We should try to support their efforts as much as possible, to alert the Quebec Media to at least ensure that the process is kept open to public input even if we think the end result is assured.

People will ask years from now, "what did you do while all this was happening?" Our consciences should be clear.

“Les Ami(e)s de la rivière Kipawa” (sic!) is a published link on the FR site. It rather appears that the organization went dormant in May 2008 based on the lack of activity.

The Montreal Club does have many other good whitewater destinations within easy reach of Montreal but the Club gave Les Ami’s 3k for the first crack at the legal challenge of the environmental assessment for the Laniel dam refurbishment.

The Hydro Quebec plan is that the annual energy to be generated at Tabaret is 0.7 TWh. Compare that to the proposed 132 MW generating capacity. The generating capacity can be as much as HQ chooses to install but the annual energy out is strictly a function of the potential (head) and the volume of water passed through the station. The apparent average utilization of the proposed 132MW station is 22%

The potential Dumoine watershed diversion is not far fetched. HQ provided for diverting part of the Moise watershed into their Sainte-Marguerite project. And they seem to be about to do just that.

No comments:

Canadian Rivers

Canadian Rivers
I speak for river users too!

The Queen is not amused!

The Queen is not amused!
http://www.ispeakforcanadianrivers.ca/

The Damned Dam - 2005 -

The Damned Dam - 2005 -
22nd Annual Kipaw Rally has modest turnout. - 23rd does better

The Ashlu river: it could happen to you

The Ashlu river: it could happen to you

Whitewater Ontario

Whitewater Ontario
Working Hard to Protect Canada's Paddling Resources

Whitewater Ontario - Mission Statement

It is Whitewater Ontario’s mission to support the whitewater paddling community through the promotion, development and growth of the sport in its various disciplines. We accomplish this through the development of events, resources, clubs, and programs for personal and athletic development, regardless of skill level or focus, to ensure a high standard of safety and competency; We advocate safe and environmentally responsible access and use of Ontario’s rivers. Whitewater Ontario is the sport governing body in the province, and represents provincial interests within the national body Whitewater Canada and the Canadian Canoe Association http://www.whitewaterontario.ca/page/mission.asp

Kipawa, Tabaret, and Opemican

Kipawa, Tabaret, and Opemican
If Hydro Quebec is not actively pursuing Tabaret what is that bite out of Opemican for?

Kipawa Dam: After

Kipawa Dam: After
Laniel Dam at 2006 Rally

Where is the Kipawa

Where is the Kipawa
Kipawa flows into lake Temiskamingue, running from Kipawa Lake, under hwy 101 in Quebec

Kipawa Dam

Kipawa Dam
laniel dam at 2004 River Rally

Tabaret is a Bad Idea

About the Kipawa



The best thing paddlers can do to help the cause of the Kipawa:

1. attend the rally and bring others including non paddlers to attend and buy beer and have fun

2. write your MP /MNA and raise the issue and post your objections -1 letter = 200 who didn't write

3. Write Thierry Vandal the CEO of Hydro Quebec strongly opposing the 132 MW standard decrying the use of "diversion" as the most environmentally inappropriate method of power production

4. Write Jean Charest, Premier of Quebec protesting that either the algonquin or the tabaret project will eliminate all other values on the Kipawa River by turning it into a dry gulch.

5. See if you can get other allied groups interested by showing your own interest, ie the Sierra Defense Fund, Earthwild, MEC, and so on.

6. Demand further consultation

7. Currently we are at the point where we need to sway public opinion and raise awareness.

However, if all else fails, don't get mad, simply disrupt, foment, and protest . The Monkey Wrench Gang.

Have you read Edward Abbey?

Important Addresses
CEO,Hydro Québec, 75 boul René Levesque, Montreal, P.Q., H2Z 1A4Caille.andre@hydro.qc.ca



Tabaret is a Bad Idea (Part Two)

Les Amis de la Riviere Kipawa is poised to use an application to the Federal Court to issue a Writ of Mandamus to ensure the Minster does what he is supposed to do, protect the public's right to navigate the water control structure at Laniel, Quebec using the Navigable Waters Protection Act. (see http://www.kipawariver.ca/)

In the now gutted Navigable Waters Protection Act lay the means by which the Minister of Transport could keep the public right of passage down our great Canadian Heritage, our rivers and streams which are threatened especially by resource corporations and power brokers such as Hydro Quebec.

These powerful entities continue to petition that 'this' river or 'that' stream is not navigable and therefore not protectable.
I don't say that dams and bridges should not be built, only that if they are, historical navigation rights should be considered and preserved by making reasonable accommodations for recreational boaters.

It is the Minister of Transport, in exercising the right to allow or disallow work on or over a navigable waterway is what keeps boats and recreational boaters plying our waterways.

To many recent cases launched in the Federal Court concerning the Navigable Waters Protection Act, most recently the case of the Humber Environment Group of Cornerbrook Newfoundland versus the Cornerbrook Pulp and Paper Company indicates that the important oversight is not being faithfully performed. Have we really come to the point now where we must say "such and such a stream is one foot deep, possessing so many cubic feet per second flow and so on?" The answer to this is... YES!

The honourable Mr. Justice John A. O'Keefe, ruled that it had not been shown that the river was navigable. How convenient was that to the Minister? But either the Minister of Transport acts to protect our rivers and streams as a public right or he does not and that means rivers and streams currently enjoyed by kayakers and canoists.

Enough of the cheating, and double-talk. Canadians! our rivers and streams are our own, lets urge the Minister of Transport and the our government to protect them.

Peter Karwacki

Tabaret is a Bad Idea (Part Three)

10 Reasons WhyTabaret is a Bad Idea1) Tabaret is too big. The station is designed to useevery drop of water available in the Kipawawatershed, but will run at only 44 percent capacity.We believe the Tabaret station is designed to usewater diverted from the Dumoine River into theKipawa watershed in the future. 2) The Tabaret project will eliminate the aquaticecosystem of the Kipawa River.The Tabaret project plan involves the diversion of a16-km section of the Kipawa River from its naturalstreambed into a new man-made outflow from LakeKipawa. 3) Tabaret will leave a large industrial footprint on thelandscape that will impact existing tourismoperations and eliminate future tourism potential. 4) The Tabaret project is an aggressive single-purposedevelopment, designed to maximize powergeneration at the expense of all other uses. 5) River-diversion, such as the Tabaret project, takinglarge amounts of water out of a river’s naturalstreambed and moving it to another place, is verydestructive to the natural environment. 6) The Kipawa River has been designated a protectedgreenspace in the region with severe limitations ondevelopment. This designation recognizes theecological, historical and natural heritage value ofthe river and the importance of protecting it.Tabaret will eliminate that value. 7) If necessary, there are other, smarter and morereasonable options for producing hydro power onthe Kipawa watershed. It is possible to build a lowimpactgenerating station on the Kipawa river, andmanage it as a “run-of-the-river” station, makinguse of natural flows while maintaining other values,with minimal impact on the environment. 8) The Kipawa watershed is a rich natural resource forthe Temiscaming Region, resonably close to largeurban areas, with huge untapped potential fortourism and recreation development in the future.Tabaret will severely reduce this potential. 9) Tabaret provides zero long-term economic benefitfor the region through employment. The plan is forthe station to be completely automated andremotely operated. 10) The Kipawa River is 12,000 years old. The riverwas here thousands of years before any peoplecame to the region. The Tabaret project will change all that.

Problems on a local River?

  • There is more to do as well but you have to do your research and above all, don't give up.
  • IN the meantime prepared a document itemizing the history of navigation of this spot and its recreational value. Use the Kipawa river history of navigation as a guide: see www.kipawariver.ca
  • Under the Ministry of Environment guidelines you have a set period of time to petition the change under the environmental bill of rights, you may have limited time to take this action. But it involves going to court for a judicial review of the decision.
  • 4. contact the ministry of natural resources officials and do the same thing.
  • 3. contact the ministry of the environment and determine if they approved the project
  • 2. determine if the dam was a legal dam, approved under the navigable waters protection act.
  • 1. research the decision and timing of it to determine if an environmental assessment was done.

Minden Ontario

Minden Ontario
Gull River Water control at Horseshoe lake

A History of Navigation on the Kipawa River

Prior to the environmental assessment there was no signage at the Laniel Dam

T-Shirts Area: These are available now!

T-Shirts Area: These are available now!
Send $25 and a stamped self addressed envelop for the Tshirt, and for the bumper sticker, a stamped and self addressed envelope with $5.00 for the bumper sticker to Les Amis de la rivière Kipawa, 80 Ontario St., Ottawa, Ontario, K1K 1K9 or click the link To purchase a Les Amis "T" contact Doug with the following information: Number of shirts:Sizes: Ship to Address: Method of Payment: cash, cheque and paypal, Shipto address:

Bumper Stickers Now Available

Bumper Stickers Now Available
Get your bumper sticker and show your support for the Kipawa Legal Fund ! - send $5.00 in a Stamped, self addressed envelope to: Peter Karwacki Box 39111, Ottawa, Ontario, Canada, K1H 7X0